Volume 2 Issue 1
Jan.  2020
Turn off MathJax
Article Contents
WANG Yaxiong. Analysis on the Tunnel Entry Technology of Super-large Cross-section[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 8-11.
Citation: WANG Yaxiong. Analysis on the Tunnel Entry Technology of Super-large Cross-section[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 8-11.

Analysis on the Tunnel Entry Technology of Super-large Cross-section

  • Received Date: 2019-12-27
  • Rev Recd Date: 2020-01-21
  • Available Online: 2022-03-28
  • Publish Date: 2020-01-28
  • With the continuous improvement of transportation demand in China, the fields involved in transportation construction engineering are also expanding. Therefore, tunnel engineering is facing great challenges. This article aims to improve the tunnel entry technology of super-large cross-section tunnels, combined with actual engineering cases. First, analyze the theory and development characteristics of the super-large cross-section tunnel; secondly,analyze the corresponding engineering examples; and finally, according to the actual situation of the project, analyze how to implement the construction technology of safe tunnel entry under the super-large cross-section condition.Through the discussion in this article, we hope that we can comprehensively improve the construction quality of current traffic engineering and further optimize the safety and stability of tunnel construction.

     

  • loading
  • [1]
    刘红轲.超大断面隧道进洞技术的探讨[J].山西建筑,2018,44(5):175-177.
    [2]
    李凯,陈军社.暗挖大断面隧道临时支撑拆除及衬砌施工方法[J].筑路机械与施工机械化,2019,36(11):62-68

    +74.
    [3]
    魏燃.Ⅴ级围岩大断面隧道开挖步序及对边坡稳定性影响研究[J].公路工程,2019,44(3):222-227.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (66) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return