Citation: | XIE Qiang. Construction and Monitoring Technology of Subway Shield Underneath the River and Bridge Pile Foundation[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 40-41. |
[1] |
李宗豪.地铁盾构施工风险的分析与控制智能城市[J].智能城市,2019,5(20):175-176.
|
[2] |
沙原亭.地铁盾构下穿河流及桥梁桩基施工与监测技术铁道建筑技术[J].铁道建筑技术,2015(10):16-22.
|
[3] |
李明华,张娟.盾构下穿桥梁及河流关键技术方案铁道建筑[J].铁道建筑,2015(7):54-57.
|
[3] | YAN Kui. Influencing Factors and Technical Support Measures for the Construction of Shield Tunnels Underneath the Existing Subway Lines with Small Spacing[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 28-31. |
[4] | ZHAO Yongxiang. Troubleshooting and Analysis of Metro Shield Machine[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 82-84. |
[5] | LIN Haibo. Analysis on the Detection Technology of Road and Bridge Pile Foundation Construction in Highway Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 86-87. |
[6] | KUAI Lei. Subway Shield Engineering Risk Source Control Technology through the Municipal Bridge[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 13-15. |
[7] | ZU Yuankai. Analysis of Construction Technology of Double Helix Shield Tunneling through the Yellow River under the Silt and Silt Liquefied Stratum[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 45-47. |
[8] | LIN Sen. Application and Development Trend of Welding Robot[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 46-48. |
[9] | YE Zhonghui. Technical Research on Three-dimensional Greening Construction in Landscape Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 103-105. |
[10] | LIU Yueqiang. Practical Technology of Smooth Blasting in Roadway Excavation[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 8-10. |
[11] | MENG Xing. Research on Key Technologies of Prefabricated Concrete Components in Prefabricated Buildings[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 33-35. |
[12] | YE Jun. Analysis of Construction Technology and On-site Construction Management of Building Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 79-81. |
[13] | TIAN Guihong. Construction Technology of Suspension Steel Cofferdam[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 76-78. |
[14] | LIU Yang. Research on Application of UAV 3D Oblique Photography Technology in Mine Monitoring[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 74-75. |
[15] | CHENG Gong. Construction Technology of Foundation Pit Monitoring in Construction Engineering[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 93-94. |
[16] | WANG Jian. Elementary Discussion on the Construction Technology of the Underground Station Excavated Passage through the Comprehensive Pipe Gallery at a Dhort[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 41-43. |
[17] | LIN Peng. Discussion on Monitoring Technology of Deep Horizontal Displacement of Foundation Pit[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 93-95. |
[18] | ZHANG Jia. Research on Treatment Technology of Bridge Pile Foundation in Karst Area[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 43-45. |
[19] | HOU Suceng. Discussion on Hazards and Key Construction Technology of Highway Engineering Settlement Section[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 15-16. |
[20] | ZHANG Wang. Research on Hydraulic System Technology of Shield Machine[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 77-78. |