LIU Jiancheng. Analysis on Installation and Test of Large Transformers in Hydropower Stations[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 52-54.
Citation: LIU Jiancheng. Analysis on Installation and Test of Large Transformers in Hydropower Stations[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 52-54.

Analysis on Installation and Test of Large Transformers in Hydropower Stations

  • Received Date: 2021-10-20
  • Rev Recd Date: 2021-12-21
  • Available Online: 2022-03-28
  • Publish Date: 2021-12-28
  • This article takes the installation of the main transformer of Silin Power Station as an example, summarizes the construction methods, process requirements, quality control points, precautions and field tests of the key procedures in the installation and test of large-scale transformers in hydropower stations; focuses on the optimization and improvement of the main transformer installation plan , Which not only guarantees the overall quality of the installation of the four large transformers, but also speeds up the construction progress, ensuring the smooth realization of the power generation target of the “four operations in a year” of the hydropower station.

     

  • loading
  • [1]
    GB50148-2010.电气装置安装工程 电力变压器、油浸电抗器、互感器施工及验收规范[S].2010.
    [2]
    GB/T7597-2007.电力用油(变压器油、汽轮机油)取样方法[S].2007.
    [3]
    GB50150-2016.电气装置安装工程电气设备交接试验标准[S].2016.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (161) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return