Volume 2 Issue 12
Dec.  2020
Turn off MathJax
Article Contents
MO Huajun. Difficulties and Measures of Construction Management in EPC Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 79-80.
Citation: MO Huajun. Difficulties and Measures of Construction Management in EPC Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 79-80.

Difficulties and Measures of Construction Management in EPC Mode

  • Received Date: 2020-11-12
  • Rev Recd Date: 2020-12-23
  • Available Online: 2022-03-28
  • Publish Date: 2020-12-28
  • In the current project construction, many enterprises have applied EPC mode, which effectively improves the construction quality of construction projects in China. The research shows that this mode can not only effectively reduce the overall production cost of the project, but also improve the construction progress of the project through effective supervision and management, so that the project can be completed within the agreed contract time. In view of this, combined with the author's many years of work experience, this paper analyzes the construction management difficulties in the EPC mode, and puts forward the corresponding solutions for reference.

     

  • loading
  • [1]
    邓洪.论EPC工程总承包模式下的现场施工管理难点分析与措施[J].四川水泥,2019(5):200-201.
    [2]
    李茂月.基于PMO的EPC工程总承包项目管理成熟度研究[D].重庆:重庆大学,2018.
    [3]
    文孟胜.EPC工程总承包模式下的现场施工管理难点分析与对策[J].工程技术研究,2018(1):157-158.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (32) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return