Volume 3 Issue 6
Jun.  2021
Turn off MathJax
Article Contents
YAN Junjun. Rail Connecting Lines C0/C2 Switch Scheme Research[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 106-107.
Citation: YAN Junjun. Rail Connecting Lines C0/C2 Switch Scheme Research[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 106-107.

Rail Connecting Lines C0/C2 Switch Scheme Research

  • Received Date: 2021-05-22
  • Rev Recd Date: 2021-06-18
  • Available Online: 2022-01-28
  • Publish Date: 2021-06-28
  • Aim at stations with short distance, the logical relationship between train control system and interlocking system was analyzed base on the actual situation, a solution was proposed to realize the switching function between CTCS-0 and CTCS-2 from the perspective of saving investment.

     

  • loading
  • [1]
    国家铁路局.TB/T3484-2017.列控系统应答器应用原则[S].北京:中国铁道出版社,2017.
    [2]
    国家铁路局.TB/T10007-2017.铁路信号设计规范[S].北京:中国铁道出版社,2017.
    [3]
    国家铁路局.TB/T3439-2016.列控中心技术条件[S].北京:中国铁道出版社,2016.
    [4]
    中国铁路总公司.Q/CR662-2018.列控系统临时限速技术规范[S].北京:中国铁道出版社,2018.
    [5]
    沈洪波,张小刚.CTCS-2级列控系统级间切换设置探讨[C]// 中国铁道学会.中国铁道学会,2012.
    [6]
    姜明华.列控系统级间转换点临时限速区段设置探讨[J].铁道通信信号,2013, 49(4):32-33.
    [7]
    崔宁宁.列控系统C0/C2级间转换方案的探讨及案例分析[J].铁道通信信号,2016, 52(6):29-30.
    [8]
    张劼.厦深线接入广深线C0/C2,C2/C0列控级间转换工程设计探讨[J].铁路通信信号工程技术,2019,v.16;No.107(11

    ):94-100.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (109) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return