Citation: | CHENG Yiyong. Analysis on the Reasons and Preventive Measures of the Installation Deviation of Metro Electromechanical Equipment[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 59-60. |
[1] |
耿宗勇.如何有效改进地铁机电安装的技术[J].智能城市,2018,4(23):163-164.
|
[2] |
石光彦.地铁车站机电设备安装综合管线施工分析[J].中国设备工程,2017(24):139-140.
|
[3] |
申屠兵.地铁机电设备的安装及其质量控制[J].科技展望,2016,26(17):138.
|