Volume 3 Issue 1
Jan.  2021
Turn off MathJax
Article Contents
GUO Songlin. Analysis of Common Problems and Solutions in Expressway Pumping Concrete Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 16-17.
Citation: GUO Songlin. Analysis of Common Problems and Solutions in Expressway Pumping Concrete Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 16-17.

Analysis of Common Problems and Solutions in Expressway Pumping Concrete Construction

  • Received Date: 2020-12-05
  • Rev Recd Date: 2021-01-20
  • Available Online: 2021-09-22
  • Publish Date: 2021-01-28
  • Aiming at the phenomenon of pumping concrete used for bridge and culvert construction in expressway construction, which is prone to block pumping and difficult pumping during the pumping process, this article analyzes the reasons for it, expounds the actual solution during the construction process, and provides a follow-up Accumulate experience and lessons during construction. Avoid recurrence of similar problems during construction or difficulty in solving problems after they occur, which will delay the progress of the project.

     

  • loading
  • [1]
    A.M.内维尔.混凝土的性能[M].北京:中国建筑工业出版社,2011(4):288-289.
    [2]
    乔运鹏.泵送混凝土使用中应注意的问题[J].建筑与工程,2006(5):99.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (289) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return