ZOU Wei. Discussion on Key Technology of Manual Hole Digging Pile Construction in Bridge Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 34-36.
Citation: ZOU Wei. Discussion on Key Technology of Manual Hole Digging Pile Construction in Bridge Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 34-36.

Discussion on Key Technology of Manual Hole Digging Pile Construction in Bridge Engineering

  • Received Date: 2021-10-08
  • Rev Recd Date: 2021-12-17
  • Available Online: 2022-03-28
  • Publish Date: 2021-12-28
  • Compared with other hole forming processes, manual hole digging pile does not need large-scale mechanical equipment, and has many advantages, such as convenient construction, simultaneous excavation of multiple piles, and little impact on the surrounding area. However, this process is carried out manually in the well, so it is dangerous and difficult to control safety. In view of this, combined with examples, this paper comprehensively discusses the key technology of manual hole digging pile construction for reference.

     

  • loading
  • [1]
    罗 文 . 人 工 挖 孔 桩 水 磨 钻 施 工 技 术 研 究 [J] . 交 通 世 界 , 2021(9):94-95.
    [2]
    吕程.人工挖孔桩施工质量控制要点分析[J].工程技术研究, 2020,5(24):150-151.
    [3]
    谢福勇,王稳,贾进.平塘特大桥主塔人工挖孔桩施工关键技术[J].公路,2019,64(9):95-97.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (109) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return