LV Shuang. Preliminary Mode Design, Negotiation Points and Precautions of Public Building PPP Project[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 115-117.
Citation: LV Shuang. Preliminary Mode Design, Negotiation Points and Precautions of Public Building PPP Project[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 115-117.

Preliminary Mode Design, Negotiation Points and Precautions of Public Building PPP Project

  • Received Date: 2020-09-03
  • Rev Recd Date: 2020-10-21
  • Available Online: 2022-03-28
  • Publish Date: 2020-10-28
  • PPP project is a new type of public engineering construction and development cooperation model,it is mainly aimed at the public and private sectors.Based on this, the research and development of this model aims to improve the construction efficiency and quality of urban public projects. This article makes a detailed analysis of the pre-phase model design and pre-negotiation key points and precautions of the PPP project.

     

  • loading
  • [1]
    张军令.PPP模式在城市基础设施建设中的应用分析[D].长春:吉林大学,2016.
    [2]
    陈晓浩.浅论基础设施类PPP项目投资前期要点[J].中国高新区,2019(13):269-270.
    [3]
    董睿楠,唐丹彤.论综合开发型PPP模式[J].江西财经大学学报,2019(6):26-35.
    [4]
    陈仙.公共交通领域PPP项目合同谈判实践及思考[J].中国水运(上半月),2020(4):106-108.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (43) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return