DOU Shuxing. Discussion on Construction Management and Lightning Protection Measures for Safe Operation of High-voltage Overhead Lines[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 1-2.
Citation: DOU Shuxing. Discussion on Construction Management and Lightning Protection Measures for Safe Operation of High-voltage Overhead Lines[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 1-2.

Discussion on Construction Management and Lightning Protection Measures for Safe Operation of High-voltage Overhead Lines

  • Received Date: 2020-03-15
  • Rev Recd Date: 2020-05-25
  • Available Online: 2022-03-28
  • Publish Date: 2020-05-28
  • With the continuous development of social economy, people's demand for power supply is gradually increasing, and at the same time, higher requirements are placed on the power supply capacity of the power supply system.Based on this, this article firstly introduces the construction characteristics of high-voltage overhead lines, then analyzes the construction failures of high-voltage overhead lines, and finally discusses strengthening the safe operation management and lightning protection measures of high-voltage overhead lines, in order to further promote the development of high-voltage overhead lines.

     

  • loading
  • [1]
    董威佐.输电线路的防雷设计与运维技术分析[J].黑龙江科学,2019(5):88-89.
    [2]
    王志峰.110 kV架空输电线路防雷应用研究[J].化工管理,2019(8):195-197.
    [3]
    韩娟琴.架空输电线路防雷与接地研究[J].电子制作,2017(15):85-86.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (196) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return