Citation: | SONG Xianbin. Analysis on the Construction Technology of Excavating the Slag Guide Shaft in a Deep Shaft of a Diversion Tunnel[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 41-43. |
[1] |
刘震,王晓玲,刘长欣,等.复杂长竖井引水隧洞施工通风两相流模拟研究[J].天津大学学报(自然科学与工程技术版),2018,51(11):1 139-1 146.
|
[2] |
王建峰,张宏仑,江河.巴贡水电站引水隧洞竖井上部钢平台拆除方案的设计与实施[J].四川水力发电,2009,28(s1):36-39.
|
[3] |
施伟.基于FBG的引水隧洞检修竖井安全监测系统应用研究[D].南京:南京理工大学,2016.
|
[1] | LI Chaohui. Research on Intelligent Building Construction and Green Construction Management[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 10-12. |
[2] | CHEN Guanneng. On Construction Technology and Site Construction Management[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 59-61. |
[4] | ZHU Zhanmei. Analysis on Construction Technology of Roller Compacted Concrete in Water Conservancy Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 32-34. |
[5] | YANG Weidong. Discussion on Construction Technology of Soft Soil Foundation in Road and Bridge Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 48-50. |
[6] | XU Kai. Discussion on Gas Control Measures in the Outlet Section of Sanyangxi Water Intake Tunnel of Shaba Reservoir in Sinan County[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 126-128. |
[7] | ZHANG Dechuan. Application Analysis of Mechanical Foaming Warm Asphalt Technology in Changshen-Beijing-Shanghai High-speed Connecting Line Project[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 54-56. |
[8] | WANG Huanzhen. Comparative Study on a New Type of Rock Excavation Method with Vibratory Rock Cracker and Traditional Non-blasting Rock Excavation Method[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 19-21. |
[9] | LI Jun. Research on Manned System in Pumped Storage Power Station[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 59-61. |
[10] | GONG Zhenzhou. Research on Key Construction Points of Road Bridge Tunnel Excavation Support[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 20-22. |
[11] | XU Dong. Calculation and Analysis of Long Distance Ventilation in TBM Tunnel Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 18-20. |
[12] | LIU Licheng. Research and Application of Mechanized Construction Technology for Small and Extra-small Section Long Tunnels in Diversion Tunnel Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 17-20. |
[13] | LONG Huihu. Key Technology for Excavation of Main Access Tunnel of a Hydropower Station in East Africa[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 19-21. |
[14] | HE Guangming. Study on Construction Technology of Expansive Concrete[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 11-12. |
[15] | WANG Xiaoguang. Large Bridge Swivel Construction Technology[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 36-37. |
[16] | WEI Qiaobang. Talking about Highway Pavement Construction Technology[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 41-43. |
[17] | FAN Zhenhao. Research on Safety Risk and Construction Safety Management of Tunnel Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 72-73. |
[18] | WANG Jiadao. Research on Construction Technology of Waterproof and Seepage Prevention in Building[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 30-31. |
[19] | LI Xian. Construction Technology of Super Deep Diaphragm Wall in Soft Soil Layer of Subway[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 24-25. |
[20] | DING Hui. Analysis of the Infl uence of the Construction of the Deep and Large Foundation Pit on the Nearby Subway Station[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 6-8. |