XUE Yuqin. Research on Cost Optimization Control Method and Application in Early Stage of Project[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 123-124.
Citation: XUE Yuqin. Research on Cost Optimization Control Method and Application in Early Stage of Project[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 123-124.

Research on Cost Optimization Control Method and Application in Early Stage of Project

  • Received Date: 2020-04-03
  • Rev Recd Date: 2020-05-22
  • Available Online: 2022-03-28
  • Publish Date: 2020-05-28
  • The reasonable control of the initial cost of the project within a certain range can effectively reduce investment risks and achieve the expected return target. Based on a comprehensive understanding of the related concepts of construction project cost, this article expounds the role of the optimization control of the early stage cost of the project, and proposes the optimization control method of the early stage cost for reference.

     

  • loading
  • [1]
    肖启艳,李国太.工程量清单计价模式下的工程造价风险管理[J].南方农机,2018(10):177.
    [2]
    黄静文.影响工程造价预结算的主要因素及成本控制方法研究[J].建材与装饰,2020,47(9):103-104.
    [3]
    高天,尹贻林,王翔.PPP模式对工程造价管理的影响及需求研究[J].项目管理技术,2018(1):30-35.
    [4]
    梅玲娜.工程造价全过程控制在施工阶段的控制要点分析[J].房地产导刊,2015(8):275.
    [5]
    郭艳平.工程造价全过程控制在施工阶段的控制要点分析[J].工程技术(文摘版),2015(12):146.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (51) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return