YIN Qianru. Preliminary Planning Decision and Cost Control in Design Stage of Engineering Project[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 36-37.
Citation: YIN Qianru. Preliminary Planning Decision and Cost Control in Design Stage of Engineering Project[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 36-37.

Preliminary Planning Decision and Cost Control in Design Stage of Engineering Project

  • Received Date: 2020-11-10
  • Rev Recd Date: 2020-12-17
  • Available Online: 2022-03-28
  • Publish Date: 2020-12-28
  • As an important part of the national economy, the construction industry has an important impact on Chinese residents. At present, the development mode of many construction enterprises is not suitable for the development of the new era, which leads to the stagnation of the development of the construction industry. In order to further improve the quality and cost of construction projects, the internal managers of enterprises must pay attention to the cost control of construction links and improve the quality of construction projects In order to improve the work process of the whole project, reduce the investment in the construction process, and realize the higher efficiency of the construction enterprise.

     

  • loading
  • [1]
    杨洪海.大型工程建设项目前期策划阶段协同管理研究[D].天津:天津大学,2018.
    [2]
    赵宗为.对工程项目前期策划与设计阶段造价控制的分析[J].金融经济,2018(14):197-198.
    [3]
    王翠平.工程项目建设前期阶段工作对工程目标管理的影响研究[D].淮南:安徽理工大学,2018.
    [4]
    朱梓菲.建设项目前期阶段的造价控制[J].四川建材,2018,43(2):224-225.
    [5]
    陈贵华.对工程项目前期策划决策和设计阶段造价控制的思考[J].铁道工程学报,2018,28(3):7-10.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (75) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return