Volume 2 Issue 10
Oct.  2020
Turn off MathJax
Article Contents
WANG Peng. Discussion on Construction Technology of Open Cutstation of Municipal Subway[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 46-47.
Citation: WANG Peng. Discussion on Construction Technology of Open Cutstation of Municipal Subway[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 46-47.

Discussion on Construction Technology of Open Cutstation of Municipal Subway

  • Received Date: 2020-09-16
  • Rev Recd Date: 2020-10-19
  • Available Online: 2022-03-28
  • Publish Date: 2020-10-28
  • Station excavation construction is an important content in municipal subway construction,and the open cut method is one of the main construction methods of the municipal subway station.In order to ensure the scientific and reasonable application of the technology and give full play to its value advantages,therefore,it is very important to do a good job in the construction technology analysis of the Municipal Subway open cut station.

     

  • loading
  • [1]
    王志强.城市地铁明挖车站施工及降水技术[J].施工技术,2019,48(s1):839-841.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (108) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return