Volume 3 Issue 4
Apr.  2021
Turn off MathJax
Article Contents
DENG Junfeng. Case Study on Demolition of Arched Grid Structure of Large-span Coal Shed[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 59-61.
Citation: DENG Junfeng. Case Study on Demolition of Arched Grid Structure of Large-span Coal Shed[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 59-61.

Case Study on Demolition of Arched Grid Structure of Large-span Coal Shed

  • Received Date: 2021-02-20
  • Rev Recd Date: 2021-04-23
  • Available Online: 2021-12-17
  • Publish Date: 2021-04-28
  • A coal mine environmental protection coal shed needs to be removed for some reason. Now, the construction of environmental protection coal shed is more, but the case of demolition of this kind of project is rarely seen, there is no experience that can be used for reference. To this end, we have formulated a more elaborate dismantling plan. According to the characteristics of the arched grid, a number of safety measures are designed to make the dismantling work orderly and safe and stable. There are some experiences that can be summed up and some processes that are worth refl ecting on, which can be used as reference for similar projects in the future.

     

  • loading
  • [1]
    王宏.大跨度钢结构施工技术[M].北京:中国建筑工业出版社, 2015
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (249) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return