XU Dong. Calculation and Analysis of Heavy Lifting of one Tunnel Double Machine TBM Equipment[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 45-47.
Citation: XU Dong. Calculation and Analysis of Heavy Lifting of one Tunnel Double Machine TBM Equipment[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 45-47.

Calculation and Analysis of Heavy Lifting of one Tunnel Double Machine TBM Equipment

  • Received Date: 2021-08-15
  • Rev Recd Date: 2021-09-15
  • Publish Date: 2021-09-28
  • Each structural part of TBM not only has amazing weight, but also has high technical content. It is required to have high reliability and safety during operation. Therefore, the assembly of the whole machine is the key point, especially the hoisting of large parts. Determine its weight before hoisting, and select the matching slings and riggings through safety calculation and analysis, so as to hoist smoothly and safely.

     

  • loading
  • [1]
    GB8918-2006,重要用途钢丝绳[S].2006.
    [2]
    SL 425-2017,水利水电起重机械安全规程[S].2017.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (63) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return