Volume 3 Issue 8
Aug.  2021
Turn off MathJax
Article Contents
LIU Ruiying. Cause Analysis and Treatment of Low Ball Collecting Rate of Condenser[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 40-42.
Citation: LIU Ruiying. Cause Analysis and Treatment of Low Ball Collecting Rate of Condenser[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 40-42.

Cause Analysis and Treatment of Low Ball Collecting Rate of Condenser

  • Received Date: 2021-06-22
  • Rev Recd Date: 2021-08-24
  • Available Online: 2022-01-28
  • Publish Date: 2021-08-28
  • The condenser of unit 4 of Jiayuguan Hongsheng electric heating Co., Ltd. is n-19500-1 type condenser produced by Harbin steam turbine works. The condenser is equipped with two sets of condenser tube bundle cleaning rubber ball devices, which often leads to low ball collecting rate.Throughthe analysis of the current situation of the equipment,the author fi nds out three causes of ball accumulation, puts forward the corresponding technical scheme and working principle, and evaluates the eff ect after the implementation of the transformation through the data, which provides a practical reference for the system to solve the problem of ball collection rate of condenser, and has great practical value for similar equipment.

     

  • loading
  • [1]
    靖长才.200 MW汽轮机凝汽器胶球收球率低的原因分析及对策[J].电站辅机,1997(3):13-14.
    [2]
    万大报.350 MW机组胶球系统收球率低的治理[J].重庆电力高等专科学校学报,2020(3):4.
    [3]
    门金成.大型燃气-蒸汽联合循环发电技术(三菱F级)[M].北京: 中国电力出版社,2017:11.
    [4]
    刘宏运,杨林冲.凝汽器胶球系统收球率低原因分析[J].工业工程设计,2019(9):21-24.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (29) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return