Citation: | CHEN Benyuan. The Important Value of Schedule Management in Construction Project Management[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 65-67. |
[1] |
郑烨.民用建筑工程管理中的进度管理方式研究[J].科技经济导刊,2021(20):236-237.
|
[2] |
张琪,王利利.建筑工程管理中进度管理的应用研究[J].现代商贸工业,2021(13):166.
|
[3] |
陈鑫.试论新时期加强建筑工程管理中进度管理的措施[J].建筑技术开发,2021(5):76-77.
|
[4] |
曾俊.建筑工程管理中进度管理的分析与应用[J].住宅与房地产,2020(36):138-139.
|
[5] |
陈军.进度管理在建筑工程管理中的重要性分析[J].居业, 2020(7):109+111.
|
[2] | SUN Jingyue. Research on Construction Progress Control and Management[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 114-116. |
[4] | TANG Hongjun. Application of Intelligent Weak Current System in Complex Building[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 4-6. |
[5] | WU Kangnan. Application of Digital Technology in Building Protection and Design[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 7-9. |
[6] | JIANG Ruowei. Key Points of Construction Quality Management of Building Ventilation and Air-conditioning Installation Engineeringv[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 25-27. |
[7] | WU Fan. Influencing Factors and Management Strategies of Construction Engineering Management[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 79-80. |
[8] | WEN Tao. Research on the Application Value of Anti-seepage Technology in the Construction of Water Conservancy Projects[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 12-14. |
[9] | WU Lei. Discussion on Construction Schedule Management of Intelligent Building Project[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 76-78. |
[10] | FAN Feifei. Analysis on the Application of Intelligent Technology in Building Electrical Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(4): 117-119. |
[11] | TAN Caixing. Discussion on Key Points and Methods of Supervision and Inspection of Building Fire Protection Facilities[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 105-107. |
[12] | YU Kai. Application Strategy of Building Fixed Fire Fighting Facilities in Fire Fighting and Rescue of Urban Complex[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 118-120. |
[13] | LU Enmin. Research on Effective Management and Control of Construction Schedule of Engineering Project[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 75-78. |
[14] | QIU Xinsheng. Explore the Existing Problems and Countermeasures in Current Construction Engineering Data Management[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 63-65. |
[15] | WANG Zhihua, GONG Xiuli. Discuss the Construction Quality Management and Control Strategy of Housing Construction Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(5): 66-67. |
[16] | SUN Chao. On the Management of Construction Project on the Construction Site[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 89-91. |
[17] | LIU Xueming. Analysis on the Application of BIM Technology in Multi-unit Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 23-24. |
[18] | YU Simeng. Application of BIM Technology in Engineering Construction Cost Control[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 45-46. |
[19] | FANG Fuguo. Problems in Municipal Engineering Management and Solutions[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 76-77. |
[20] | XIE Qiaoling. Application and Development of Innovative Mode in Construction Engineering Management[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 59-60. |