WANG Shiyan. Discussion on the Check and Analysis of Reinforcement EngineeringQuantity in Completion Settlement[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 109-110.
Citation: WANG Shiyan. Discussion on the Check and Analysis of Reinforcement Engineering Quantity in Completion Settlement[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 109-110.

Discussion on the Check and Analysis of Reinforcement Engineering Quantity in Completion Settlement

  • Received Date: 2020-03-06
  • Rev Recd Date: 2020-04-16
  • Available Online: 2022-03-29
  • Publish Date: 2020-04-28
  • With the continuous development of the construction industry, the level of project cost management is gradually improved, among which the reinforcement work quantity audit plays an important role in the completion settlement stage. In view of the quantity of reinforcement, not only the total amount of reinforcement materials should be calculated, but also the later quantity work should be done well. Based on this, this paper discusses the problems existing in the audit of reinforcement quantity in the completion settlement, and puts forward the application strategy of the reinforcement quantity audit in the completion settlement.

     

  • loading
  • [1]
    李文玉.基于G16101平法图集钢筋工程量计算问题研究[J].建筑工程技术与设计,2020(5):3 339.
    [2]
    陈卓.钢筋混凝土灌注桩钢筋笼工程量计算的要点分析[J].建筑工程技术与设计,2018(32):185.
    [3]
    姜轶.对工程造价专业《钢筋工程量计算》信息化课改的实践[J].产业与科技论坛,2018(22):204-205.
    [4]
    邱枫.建筑物钢筋工程量的计算[J].山东工业技术,2017(18):119.
    [5]
    冯晓俊.建筑工程钢筋工程量计算技巧探讨[J].建筑工程技术与设计,2017(31):2657.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (117) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return