XU Dong. Calculation and Analysis of Long Distance Ventilation in TBM Tunnel Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 18-20.
Citation: XU Dong. Calculation and Analysis of Long Distance Ventilation in TBM Tunnel Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 18-20.

Calculation and Analysis of Long Distance Ventilation in TBM Tunnel Construction

  • Received Date: 2021-08-15
  • Rev Recd Date: 2021-10-18
  • Available Online: 2022-01-28
  • Publish Date: 2021-10-28
  • TBM method for long and long tunnel construction, long-distance ventilation, prominent problems and great significance. In this paper, through calculation and analysis, reasonable selection and optimal matching, the one-stop forced ventilation system is adopted. Through strict management, the ventilation standard is reached, the project progress is promoted, and the good working environment and the physical and mental health of employees are ensured.

     

  • loading
  • [1]
    SL378-2007,水工建筑物地下开挖工程施工规范[S].2007.
    [2]
    水利电力部水利水电建设总局.水利水电工程施工组织设计手册[S].北京:中国水利水电出版社,1990.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (112) PDF downloads(3) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return