Volume 2 Issue 4
Apr.  2020
Turn off MathJax
Article Contents
ZHANG Jia. Research on Treatment Technology of Bridge Pile Foundation in Karst Area[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 43-45.
Citation: ZHANG Jia. Research on Treatment Technology of Bridge Pile Foundation in Karst Area[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 43-45.

Research on Treatment Technology of Bridge Pile Foundation in Karst Area

  • Received Date: 2020-02-13
  • Rev Recd Date: 2020-04-11
  • Available Online: 2022-03-28
  • Publish Date: 2020-04-28
  • During the pile foundation construction of the new bridge of Guanhua Avenue, there are some technical problems, such as karst cave, slurry leakage and hole collapse during drilling,hammer sticking and hammer dropping, and underwater concrete pouring loss. During the construction, slurry filling, yellow clay rubble backfilling, steel casing follow-up, automatic punching electronic control equipment, increasing the buried depth of conduit, increasing the initial stock of concrete, embedding steel casing and other measures were adopted to reduce the sticking Accidents such as hammer dropping and underwater concrete pouring loss ensure the quality, progress and safety of pile foundation construction.

     

  • loading
  • [1]
    徐青旺.岩溶地区桥梁桩基施工技术优化研究[J].铁道建筑技 术,2017(12):64-68.
    [2]
    郑新军.复杂岩溶地段桥梁桩基施工技术[J].中国西部科技, 2015,14(5):55-56.
    [3]
    刘国喜.岩溶地区大桥桩基下伏溶洞稳定性研究[D].北京:北京科技大学,2005.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (66) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return