LI Shixing. Analysis of the 70-hour Construction Plan for Crossing the Western Throat of Wuxi Ⅲ Field[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 24-26.
Citation: LI Shixing. Analysis of the 70-hour Construction Plan for Crossing the Western Throat of Wuxi Ⅲ Field[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 24-26.

Analysis of the 70-hour Construction Plan for Crossing the Western Throat of Wuxi Ⅲ Field

  • Received Date: 2020-12-08
  • Rev Recd Date: 2021-01-20
  • Available Online: 2021-09-22
  • Publish Date: 2021-01-28
  • This project is the construction of Jinyang Road Reconstruction and Expansion Project under the 2 ~ 12.5 m frame bridge under the throat area at the west end of Wuxi Station III. Wuxi Station is the largest marshalling station in the northwest region and is responsible for the main cargo marshalling, The shunting and receiving and dispatching tasks are basically in the busy period throughout the year. After 6 months of plan discussion and approval, the Ministry of Railways finally adopted this construction plan. The construction level is set as Class I construction. The specific plan is within 70 hours. The throat lines and turnouts at the west end of Wuxi Ⅲ Field were intermittently blocked, and the throat area was completely blocked for 36 hours. The framed bridge used large excavation and jacking technology to pass through the west throat area of Wuxi Ⅲ Field.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (104) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return