WANG Zhaozhao. Construction Technology of Cast-in-place Pile in Riprap Area[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 40-42.
Citation: WANG Zhaozhao. Construction Technology of Cast-in-place Pile in Riprap Area[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 40-42.

Construction Technology of Cast-in-place Pile in Riprap Area

  • Received Date: 2021-12-20
  • Rev Recd Date: 2022-03-19
  • Available Online: 2022-07-04
  • Publish Date: 2022-03-28
  • Due to the unreasonable urban planning in advance and the lack of sufficient space reserved for port storage services, land reclamation has become a method to improve the storage capacity of a city. The riprap method is generally used in the reclamation area. When other buildings are built on the upper part of the reclamation area, especially the pile foundation, riprap will make the construction of cast-in-place pile extremely difficult, Percussion drilling is often used for construction in China. This method has low construction efficiency and serious hole expansion. This paper introduces a band-pass drilling pile foundation construction technology to solve the difficult problem of cast-in-place pile construction.

     

  • loading
  • [1]
    李进.旋挖灌注桩施工工艺探讨[J].工程建设与设计,2016(18): 173-174.
    [2]
    李昂.钻孔灌注桩施工技术研究[J].工程技术研究,2020(8):66-67.
    [3]
    杨玉辉.钻孔灌注桩施工要点[J].建筑技术开发,2007(7):51-52.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (114) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return