| Citation: | ZHU Shumin. Research on Construction Technology of Hydraulic Climbing Formwork for Main Tower of Luoxi[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 76-77. | 
	                | [1] | 
					 郑育林,郭永伟,杨益波.斜拉桥大曲率+多曲率人字形主塔施工技术研究[J].施工技术,2017(s2):901-906. 
					
					 | 
			
| [2] | 
					 尹振君.黄冈公铁两用长江大桥桥塔液压爬模施工技术[J].世界桥梁,2015(1):18-22. 
					
					 | 
			
| [3] | 
					 李学智.鸭绿江界河斜拉桥主墩塔柱液压爬模施工[J].公路,2013(8):96-98. 
					
					 |