Citation: | YU Tong. Cause Analysis and Countermeasures of High Shaft Vibration of Air Centrifugal Compressor[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 55-57. |
[5] 史先方.螺杆压缩机振动原因分析及对策[J].设备管理与维修,2003(11):13.
|
|
[1] |
王静.无油螺杆空气压缩机振动高的原因分析与对策[J].四川化工,2014,17(6):46-49.
|
[2] |
张小勤,姚玉环.三催化空气压缩机高速轴振动原因分析[J].甘肃科学学报,2015,27(2):93-96.
|
[3] |
陈仁来.空气压缩机振动原因分析及改进措施[J].石油化工设备技术,2004,25(5):44-46.
|
[4] |
郭怡,张宏权.离心式压缩机轴振动高原因分析及技术改进[J].河南科技(上半月),2012(2):79.
|
[6] |
龚宝龙.离心压缩机叶轮内湍流及冲蚀磨损特性研究[D].济南:山东大学,2014.
|
[7] |
王光存,李剑峰,贾秀杰,等.离心压缩机叶轮材料FV520B冲蚀规律和机理的研究[J].机械工程学报,2014(19):182-190.
|
[8] |
张思雨.空气压缩机入口过滤器系统的改造设计[J].炼油与化工,2018(4):55-56.
|
[3] | TANG Cheng. Analysis and Countermeasures of Fire Protection Design of High-rise Civil Buildings[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 37-39. |
[5] | ZHAO Yangyang. Analysis of Over-square Causes and Control Measures of Wet Sshotcrete in Tunnel[J]. Intelligent Building and Construction Machinery, 2022, 4(1): 43-45. |
[6] | ZHENG Jiawei. Research on the Countermeasures of Building Fire Prevention Supervision and Fire Facilities Confi guration[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 126-128. |
[7] | CHEN Yan. Analysis of the Problems and Countermeasures in the Quality Management of Mmunicipal Engineering Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 61-62. |
[8] | CHEN Wenqing. Difficulties and Technical Countermeasures in Road, Bridge and Tunnel Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 37-39. |
[9] | ZHU Min. Problems and Countermeasures in the Cost Management of Housing Construction Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(8): 80-82. |
[10] | ZHOU Yucheng. Problems Existing in the Quality of Building Fire Protection Products and Solutions[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 117-119. |
[11] | DU Bing. Discussion on Problems and Countermeasures of International Engineering Contract Management[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 66-68. |
[12] | WEI Lingfei. Research on the Problems and Countermeasures of Construction Project Bidding[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 124-125. |
[13] | HUANG Canlin. Reasons and Solutions for Oil Leakage of the Lip Seal Ring of the Driving Shaft of the Integral Reducer[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 71-73. |
[14] | XIAO Qiaolian. Problems and Countermeasures of Water Conservancy Project Management in Grass Roots[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 80-81. |
[15] | MENG Libo. Discussion on Geotechnical Engineering Foundation Design and Countermeasures[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 21-22. |
[16] | FANG Fuguo. Problems in Municipal Engineering Management and Solutions[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 76-77. |
[17] | KANG Miao. Research on Common Problems and Countermeasures in Highway Bridge and Culvert Design[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 13-14. |
[18] | CHENG Yiyong. Analysis on the Reasons and Preventive Measures of the Installation Deviation of Metro Electromechanical Equipment[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 59-60. |
[19] | ZHOU Lichao. Analysis on the Causes and Preventive Measures of Concrete Cracks in Tunnel Engineering[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 50-51. |
[20] | WANG Xiangxiang. Talking about the Causes of Roof Waterproof Leakage and Solutions[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 101-103. |