Volume 2 Issue 6
Jun.  2020
Turn off MathJax
Article Contents
CHEN Guanxi. Discussion on Application of Stone Filled Subgrade in Highway Engineering Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 28-29.
Citation: CHEN Guanxi. Discussion on Application of Stone Filled Subgrade in Highway Engineering Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 28-29.

Discussion on Application of Stone Filled Subgrade in Highway Engineering Construction

  • Received Date: 2020-04-09
  • Rev Recd Date: 2020-06-01
  • Available Online: 2022-03-28
  • Publish Date: 2020-06-28
  • Studies have shown that building highway projects in mountainous areas will encounter many sections of high filling and deep excavation. Therefore, stone filling accounts for a large proportion of the total filling, and the construction factors of stone filling subgrades are complex and changeable. Based on this, this article explains how to pass Scientific construction techniques and construction techniques are used to ensure the quality of stone-filled roadbeds, in order to provide references for related construction.

     

  • loading
  • [1]
    DB22T 1961-2013,公路填石路基施工技术规范吉林省地方标 准[S].
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (57) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return