Volume 2 Issue 6
Jun.  2020
Turn off MathJax
Article Contents
LI Xiaoxia. Discussion on the Maintenance and Reinforcement Technology of Zhengjialiang 2# Bridge and Yingzui Bridge of G109 Line in Baiyin Highway Section in 2019[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 19-21.
Citation: LI Xiaoxia. Discussion on the Maintenance and Reinforcement Technology of Zhengjialiang 2# Bridge and Yingzui Bridge of G109 Line in Baiyin Highway Section in 2019[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 19-21.

Discussion on the Maintenance and Reinforcement Technology of Zhengjialiang 2# Bridge and Yingzui Bridge of G109 Line in Baiyin Highway Section in 2019

  • Received Date: 2020-05-13
  • Rev Recd Date: 2020-06-13
  • Available Online: 2022-03-28
  • Publish Date: 2020-06-28
  • Yingzui Bridge was built in 1998. The upper structure of the bridge is a 1~6 m reinforced concrete rectangular slab, and the lower part is a concrete U-shaped platform expansion foundation. The main diseases of the bridge: there are 6 longitudinal through seams and 2 transverse cracks at the bottom of the slab; 1 transverse through seam and 3~4 vertical cracks on the 0 and 1# platform bodies. The cracks were sealed by glue injection in 2018 Treat. The side walls have serious vertical and horizontal cracks, the concrete falls off, and the platform cap cracks; the bottom of the bridge part of the slab is effluent, rusted, and carbonized, and the concrete falls off seriously.

     

  • loading
  • [1]
    赵珏亮.浅谈钢波纹板加固施工在桥涵中的应用[J].中小企业管理与科技(下旬刊),2020(1):172-173.
    [2]
    赵海军.波纹板加固对重载铁路既有涵洞性能的影响[J].内蒙古科技与经济,2019(18):97-101+143.
    [3]
    赵海军.重载铁路既有涵洞及加固后涵洞性能影响研究[D].石家庄:石家庄铁道大学,2019.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (57) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return