Volume 3 Issue 7
Jul.  2021
Turn off MathJax
Article Contents
SHI Chao. Preliminary Study on Mechanical Cooling Technology in High Temperature Environment during Tunnel Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 52-54.
Citation: SHI Chao. Preliminary Study on Mechanical Cooling Technology in High Temperature Environment during Tunnel Construction[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 52-54.

Preliminary Study on Mechanical Cooling Technology in High Temperature Environment during Tunnel Construction

  • Received Date: 2021-05-15
  • Rev Recd Date: 2021-07-19
  • Available Online: 2022-01-28
  • Publish Date: 2021-07-28
  • The high temperature and heat damage in the construction stage of tunnel engineering will not only reduce the work efficiency of workers, but also may cause safety hazards and threaten the lives of workers. Based on the analysis of the causes of high temperature in tunnel construction, the article designs and develops a cooling system with refrigeration units as the core, and uses it to achieve mechanical cooling. It is found that this system can reduce the air temperature by about 15 ℃ , ensuring that the ambient temperature and humidity of the working surface are below 25 ℃ and 75%, respectively.

     

  • loading
  • [1]
    潘程睿,罗志,陈雅婷.高温隧道施工技术及投资构成分析[J].铁路工程造价管理,2014,29(2):39.
    [2]
    田普卓.高地温隧道施工降温技术相关问题探讨[J].中国标准化,2019(22):9-10.
    [3]
    李建高,刘亚飞.高黎贡山隧道1~#高地温斜井降温处理技术研究及比选[J].隧道建设(中英文),2020(10):114

    -121.
    [4]
    苗永旺,陈佐林,彭学军,等.高原、高地温隧道施工爆破及降温措施的探讨[J].高速铁路技术,2019,10(4):95-98.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (74) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return