Volume 2 Issue 10
Oct.  2020
Turn off MathJax
Article Contents
MA Yuxin. Project Design Management under EPC General Contracting Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 92-93.
Citation: MA Yuxin. Project Design Management under EPC General Contracting Mode[J]. Intelligent Building and Construction Machinery, 2020, 2(10): 92-93.

Project Design Management under EPC General Contracting Mode

  • Received Date: 2020-09-03
  • Rev Recd Date: 2020-10-21
  • Available Online: 2022-03-28
  • Publish Date: 2020-10-28
  • In the current international engineering market, EPC general contracting mode is one of the more popular contract modes. In China, more and more large-scale projects adopt this contract mode, the comprehensive capability of contractors is uneven, the lack of design management ability is the main reason why EPC general contract management can not achieve the expected objectives. Based on this, this paper studies and analyzes the project design management under the EPC mode, for reference.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (118) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return