ZHOU Lichao. Analysis on the Causes and Preventive Measures of Concrete Cracks in Tunnel Engineering[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 50-51.
Citation: ZHOU Lichao. Analysis on the Causes and Preventive Measures of Concrete Cracks in Tunnel Engineering[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 50-51.

Analysis on the Causes and Preventive Measures of Concrete Cracks in Tunnel Engineering

  • Received Date: 2020-07-05
  • Rev Recd Date: 2020-08-19
  • Available Online: 2022-03-28
  • Publish Date: 2020-08-28
  • Aff ected by various factors, there will be cracks in the concrete lining of tunnel engineering, which seriously affects the quality of tunnel engineering.In order to ensure the stability of the lining concrete structure of the tunnel project, the reasons for the cracks should be analyzed, scientific and reasonable preventive measures should be taken to strictly control the width and quantity of the cracks, and the quality of construction raw materials and construction technology should be controlled to further improve the quality of the lining concrete construction.

     

  • loading
  • [1]
    顾欣.地铁隧道衬砌混凝土及检测试验研究[J].科技风,2019(36):89.
    [2]
    杨剑雄.隧道衬砌混凝土裂缝治理措施[J].城市住宅,2018,25(3):112-115

    +118.
    [3]
    张永福.隧道衬砌混凝土裂缝原因分析及处理[J].建材与装饰,2020(3):260-261.
    [4]
    张素磊,张顶立,刘昌.公路运营隧道衬砌裂缝长期监测及分析[J].现代隧道技术,2017,54(3):17-25.
    [5]
    郭二宁.隧道混凝土衬砌裂缝的成因及处理[J].工程技术研究,2018(6):131-132.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (83) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return