HUANG Ping. Research on Welding and Quality Control of Rotor Support of Baihetan Right Bank Power Station[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 51-52.
Citation: HUANG Ping. Research on Welding and Quality Control of Rotor Support of Baihetan Right Bank Power Station[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 51-52.

Research on Welding and Quality Control of Rotor Support of Baihetan Right Bank Power Station

  • Received Date: 2020-05-06
  • Rev Recd Date: 2020-06-16
  • Available Online: 2022-03-28
  • Publish Date: 2020-06-28
  • The generator rotor is one of the main parts of hydro generator set, it has the characteristics of large size,many processes and complex structure. This paper takes the Right Bank Hydropower Station of Baihetan as an example, the welding quality control method of disc support rotor is introduced, the improvement measures of welding process for this kind of rotor bracket are summarized, the deformation control method and defect treatment measures in the welding process are mainly analyzed, in order to further improve the welding quality of rotor bracket.

     

  • .[3] 中国葛洲坝集团公司.三峡700 MW水轮发电机组安装技术[M].北京:中国电力出版社,2006.
    [1]
    周晖,吴建洪,陈梁年,等.水轮机及附属设备安装[M].北京:中国水利水电出版社,2019.
    [2]
    盛国林.水电站机组设备及运行[M].北京:化学工业出版社,2010
    [4]
    肖惠民.中小型水轮发电机组运行与检修[M].北京:中国电力出版社,2007.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (130) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return