Analysis on the Design of Temporary Power Consumption Scheme for TBM Construction

  • Received Date: 2021-09-08
  • Rev Recd Date: 2021-10-21
  • Available Online: 2022-01-28
  • Publish Date: 2021-10-28
  • This article takes the design of the temporary power supply scheme for the construction of two TBMs in the Xinjiang Kashuang Water Transmission Tunnel Project as an example to summarize the planning and layout of the regional substations and the selection of high-voltage power supply modes in the power supply and transformation system of the whole plant. It focuses on the load calculation of electrical equipment, line voltage drop verification, emergency power supply selection, etc. The application of sulfur hexafluoride and solidstate insulated high-voltage ring network cabinets in the design improves the reliability and safety of temporary power use; In the design, aluminum cables are used as high-voltage power supply lines, which greatly reduces the cost.

     

  • loading
  • [1]
    GB50052-2009,供配电系统设计规范[S].2009.
    [2]
    JGJ16-2016,民用建筑电气设计规范[S].2016.
    [3]
    GB/T12325-2008,电能质量 供电电压偏差[S].2008.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (51) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return