Volume 3 Issue 2
Feb.  2021
Turn off MathJax
Article Contents
WEI Lingfei. Research on the Problems and Countermeasures of Construction Project Bidding[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 124-125.
Citation: WEI Lingfei. Research on the Problems and Countermeasures of Construction Project Bidding[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 124-125.

Research on the Problems and Countermeasures of Construction Project Bidding

  • Received Date: 2020-12-01
  • Rev Recd Date: 2021-02-19
  • Publish Date: 2021-02-28
  • With the continuous development of the construction industry, the bidding system has been widely used in construction projects. Due to the guidance of the bidding system, a more suitable construction team can be found, which has brought huge economic benefi ts to the construction unit. Based on this, this article conducts an in-depth analysis of the existing problems in the bidding of current construction projects, combined with the actual project, expounds relevant solutions for reference.

     

  • loading
  • [1]
    吴昊.招投标阶段中工程造价存在的问题与控制对策[J].江西建材,2020(11):243+245.
    [2]
    刘睿.水利工程项目建设招投标存在的问题及解决对策[J].农业科技与信息,2020(6):107-108.
    [3]
    王晓楠,刁磊.工程建设项目招投标存在的问题及对策[J].住宅与房地产,2020(9):20.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (361) PDF downloads(24) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return