Citation: | ZHANG Zipeng. Research on Anti-cracking Measures of Super-long Concrete Structure[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 4-5. |
[1] |
赵海东,赵鸣,沈水明.超长钢筋混凝土结构的温度响应[J].四川建筑科学研究,2007(4):15.
|
[4]张素娟.关于超长地下室混凝土结构防裂技术的探讨[J].科技创新与应用,2012(23):249.
|
|
[2] |
简华丽,袁继雄,谢慧才.泵送混凝土早期裂缝分析[J].四川建筑科学研究,2003(15):12-16.
|
[3] |
鲍俊玲,郭毅霖.复合水泥浆体自收缩及微观孔结构研究[C]//中国硅酸盐学会水泥分会首届学术年会论文集,2009.
|
[5] |
刘中福.膨胀混凝土在超长结构施工中的应用[J].中国高新技术企业,2007(10):156+164.
|
[2] | LI Junjie. Optimization Countermeasures for Grid Management of Highway Maintenance[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 120-122. |
[4] | SHI Haibin. Application of Foamed Asphalt Cold Recycling in Road Maintenance[J]. Intelligent Building and Construction Machinery, 2022, 4(3): 31-33. |
[5] | WEN Tao. Research on the Application Value of Anti-seepage Technology in the Construction of Water Conservancy Projects[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 12-14. |
[6] | TIAN Jun. Talking about the Application of New Construction Technology of Asphalt Concrete Anti-seepage Core Wall of Earth-rock Dam[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 26-28. |
[7] | XIAN Guangwei. Analysis on the Application of Clay Concrete in the Dam Impervious Wall of Sifangbei Reservoir[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 49-51. |
[8] | XU Jian. Discussion on the Prevention of Concrete Cracks in Municipal Engineering[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 25-26. |
[9] | ZHOU Yujiang. Countermeasures for Appearance Quality Defects of Prestressed Concrete Continuous Box Girder[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 71-72. |
[10] | WANG Zhen. Construction Plan for Treatment of Deep Concrete Cracks[J]. Intelligent Building and Construction Machinery, 2021, 3(6): 22-24. |
[11] | ZHENG Zhenpo. Causes and Countermeasures of Cracks in Web of Prestressed Concrete Castin-place Box Girder[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 43-44. |
[12] | LI Hong'en. Study on Hydration Heat and Temperature Control Measures of Mass Concrete[J]. Intelligent Building and Construction Machinery, 2021, 3(11): 39-41. |
[13] | LI Yongliang. Application of Vertical Seepage Control Technology in Dam Reinforcement[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 17-18. |
[14] | YUAN Xiao. Research on Construction Technology and Optimization Measures of Anti-leakage in Housing Construction[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 33-34. |
[15] | LI Xin. Talking about the Construction Technology of Concrete Anti-seepage Wall in Gangu Urban and Rural Water Supply Dazhuang Project[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 38-40. |
[16] | YU Boda. Research on Causes and Prevention Measures of Cracks in Highway Tunnels[J]. Intelligent Building and Construction Machinery, 2020, 2(12): 28-29. |
[17] | WANG Jiadao. Research on Construction Technology of Waterproof and Seepage Prevention in Building[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 30-31. |
[18] | SUN Xiaogang. Discussion on Maintenance and Repair of Railway Track[J]. Intelligent Building and Construction Machinery, 2020, 2(6): 104-105. |
[19] | ZHANG Lichen. Technical Research Based on Maintenance and Repair Construction of Expressway Asphalt Pavement[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 7-8. |
[20] | LI Hongfeng. Discussion on Crack Prevention Technology of Reinforced Concrete Construction of Highway Bridge[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 17-18. |