Volume 3 Issue 10
Oct.  2021
Turn off MathJax
Article Contents
ZHANG Wei. Analysis of Risk Management in the Signing Phase of EPC General Contracting Projects[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 88-89.
Citation: ZHANG Wei. Analysis of Risk Management in the Signing Phase of EPC General Contracting Projects[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 88-89.

Analysis of Risk Management in the Signing Phase of EPC General Contracting Projects

  • Received Date: 2021-09-07
  • Rev Recd Date: 2021-10-19
  • Available Online: 2022-01-28
  • Publish Date: 2021-10-28
  • EPC is a kind of general contracting mode of engineering. Design, procurement and construction general contracting (EPC: a combination of Engineering (design), Procurement (procurement), and Construction (construction)), the contractor is fully responsible for the quality, safety, progress, and acceptance of the project during the execution of the entire contract. Based on the analysis of various risk factors of EPC general contracting contract risk, the article puts forward some suggestions for the avoidance of EPC general contracting bidding risk.

     

  • loading
  • [1]
    政府投资条例[S].2019.
    [2]
    建市规[2019]12号,房屋建筑和市政基础设施项目工程总承包管理办法[S].
    [3]
    GF-2020-0216,建设项目工程总承包合同(示范文本)[S].[4] 住房城乡建设部 财政部关于印发建设工程质量保证金管理办法的通知[J].中华人民共和国国务院公报,2017(34):77-78.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (87) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return