Volume 2 Issue 1
Jan.  2020
Turn off MathJax
Article Contents
SUN Chuanyu. Discussion on Key Construction Technology of Frame Pier with Small Angle Crossing Existing Line[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 15-17.
Citation: SUN Chuanyu. Discussion on Key Construction Technology of Frame Pier with Small Angle Crossing Existing Line[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 15-17.

Discussion on Key Construction Technology of Frame Pier with Small Angle Crossing Existing Line

  • Received Date: 2019-12-03
  • Rev Recd Date: 2020-01-22
  • Available Online: 2022-03-28
  • Publish Date: 2020-01-28
  • Combined with the 334# - 41# pier portal frame pier structure of Wangcun North Tongpu railway Super Major Bridge on the North Tongpu connecting line of Daxi passenger dedicated line, this paper introduces the construction technology of adjusting span beam, cross beam and bridge deck system transverse wet connection using stainless steel formwork outside the line to make assembly and integral hoisting, and introduces the construction technology of integral simple movable formwork used in the pouring of bridge surface flange plate, as well as the sound of the upper span existing line Barrier bracket construction technology, in order to provide reference for similar engineering construction.

     

  • loading
  • [1]
    张洪忠.天津大北环线跨既有铁路框架墩施工技术[J].价值工程,2018,37(15):177-179.
    [2]
    耿庆军.跨既有线门式墩施工技术[J].黑龙江科技信息,2009(4):185.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (117) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return