Volume 4 Issue 2
Feb.  2022
Turn off MathJax
Article Contents
ZENG Qiang. Construction Control Measures for Large-span and Large-area Tower Group Operation in Metro Depot[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 16-18.
Citation: ZENG Qiang. Construction Control Measures for Large-span and Large-area Tower Group Operation in Metro Depot[J]. Intelligent Building and Construction Machinery, 2022, 4(2): 16-18.

Construction Control Measures for Large-span and Large-area Tower Group Operation in Metro Depot

  • Received Date: 2021-12-15
  • Rev Recd Date: 2022-03-22
  • Available Online: 2022-03-28
  • Publish Date: 2022-02-28
  • There are permanent joint maintenance shed, operation shed and throat area under the upper cover platform of metro depot, and the later upper cover property development conditions are reserved on the upper part of the platform. This paper is based on the liyuantou depot project of Tianjin metro line 5, in which the joint maintenance depot is the vehicle overhaul workshop shared by Tianjin metro lines 5 and 10. This paper summarizes and discusses the construction of large-span and large-area group towers, so as to provide technical reference for the construction of similar depot projects in the future.

     

  • loading
  • [1]
    汤旭东.建筑塔吊安装关键问题探讨[J].江西建材,2014(15):249.
    [2]
    刘晓泉,高攀,潘天华.行走式塔吊群塔作业施工技术[J].建筑技术,2008,39(10):763-764.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (194) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return