Volume 4 Issue 1
Jan.  2022
Turn off MathJax
Article Contents
ZHAO Yangyang. Analysis of Over-square Causes and Control Measures of Wet Sshotcrete in Tunnel[J]. Intelligent Building and Construction Machinery, 2022, 4(1): 43-45.
Citation: ZHAO Yangyang. Analysis of Over-square Causes and Control Measures of Wet Sshotcrete in Tunnel[J]. Intelligent Building and Construction Machinery, 2022, 4(1): 43-45.

Analysis of Over-square Causes and Control Measures of Wet Sshotcrete in Tunnel

  • Received Date: 2021-11-12
  • Rev Recd Date: 2021-01-20
  • Available Online: 2022-03-28
  • Publish Date: 2022-01-28
  • Taking the EMZQ-3 bid Laobishan tunnel project from Emei to Miyi section in Chengdu–Kunming Railway as an example, this paper expounds the causes of over-prescription of wet shotcrete in Laobishan tunnel, and formulates the control measures according to the causes, as well as the economic and social benefits, it provides a feasible scheme for reducing the cost of tunnel construction, and has certain reference significance for the over-square control of wet shotcrete in the future.

     

  • loading
  • [1]
    刘俊峦.隧道喷射混凝土回弹率控制措施[J].交通世界(下旬刊),2017(10):126-127.
    [2]
    王俊,琚元元,周洋.混凝土湿喷机械手在长大隧道中的应用[J].建设科技,2015(15):181-182.
    [3]
    韩立中.湿喷机械手施工技术在铁路单线隧道中的应用[J].建筑工程技术与设计,2018(3):823-824.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (311) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return