Volume 3 Issue 10
Oct.  2021
Turn off MathJax
Article Contents
CHU Dalin. On the Installation and Implementation Air Conditioning System in Commercial Building[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 15-17.
Citation: CHU Dalin. On the Installation and Implementation Air Conditioning System in Commercial Building[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 15-17.

On the Installation and Implementation Air Conditioning System in Commercial Building

  • Received Date: 2021-09-05
  • Rev Recd Date: 2021-10-21
  • Available Online: 2022-01-28
  • Publish Date: 2021-10-28
  • This plan is to carry on the shopping mall cold volume analysis, air volume calculation and analysis of the results of the analysis, the selection of appropriate air conditioning equipment and related systems, and related to its description.

     

  • loading
  • [1]
    陆耀庆.实用供暖空调设计手册(第2版)[M].北京:中国建筑工业出版社,2006.
    [2]
    陆耀庆.供暖通风设计手册[M].北京:中国建筑工业,1987.
    [3]
    周邦宁.中央空调设备选型手册[M].北京:中国建筑工业出版社, 1999.
    [4]
    采暖通风与空气调节设计规范[M].北京:中国计划出版社, 1989.
    [5]
    GB50019—2015,采暖通风与空气调节设计规范[S].
    [6]
    GB50016-2018,建筑设计防火规范[S].
    [7]
    GB50243-2016,通风与空调工程施工质量验收规范[S].
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (148) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return