Volume 2 Issue 7
Jul.  2020
Turn off MathJax
Article Contents
GUO Mengzhuo. Implementation Experience and Enlightenment of Naming and Numbering Adjustment Project of Common Trunk Highway in Henan Province[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 5-6.
Citation: GUO Mengzhuo. Implementation Experience and Enlightenment of Naming and Numbering Adjustment Project of Common Trunk Highway in Henan Province[J]. Intelligent Building and Construction Machinery, 2020, 2(7): 5-6.

Implementation Experience and Enlightenment of Naming and Numbering Adjustment Project of Common Trunk Highway in Henan Province

  • Received Date: 2020-06-09
  • Rev Recd Date: 2020-07-22
  • Available Online: 2022-03-28
  • Publish Date: 2020-07-28
  • In 2018, my country launched the road network naming and numbering and the adjustment of traffic signs.Since this large-scale road network traffic sign adjustment is the first in the field of ordinary roads, the grassroots units encountered some problems in the early stage of the work. Based on this, the highway management and maintenance personnel of Henan Province have taken active measures to solve the specific situation in order to provide reference for the development of similar projects.

     

  • loading
  • [1]
    中华人民共和国交通运输部.国家公路网交通标志调整工作技术指南[M].北京:人民交通出版社,2018.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (76) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return