Volume 3 Issue 12
Dec.  2021
Turn off MathJax
Article Contents
TANG Zhengjun. Key Technology of Dam Cofferdam filling Construction of Sanghe II[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 10-12.
Citation: TANG Zhengjun. Key Technology of Dam Cofferdam filling Construction of Sanghe II[J]. Intelligent Building and Construction Machinery, 2021, 3(12): 10-12.

Key Technology of Dam Cofferdam filling Construction of Sanghe II

  • Received Date: 2021-10-20
  • Rev Recd Date: 2021-12-16
  • Available Online: 2022-03-28
  • Publish Date: 2021-12-28
  • The upstream and downstream Cofferdams of phase II of Sanghe hydropower station have large filling quantities, tight construction period, high filling intensity and strict quality requirements. Therefore, it is very important to pay close attention to the filling construction control. Based on this, combined with the actual cofferdam filling construction of the project, this paper makes a detailed exploration on the key technologies of dam cofferdam filling construction of hydropower station for reference.

     

  • loading
  • [1]
    谢绍思.去学水电站围堰填筑施工及施工质量控制[J].云南水力发电,2016,32(1):74-77.
    [2]
    岳朝俊,李昊,余胜祥,等.巴基斯坦卡洛特水电站围堰设计与施工[J].水利水电快报,2020,41(3):47-51.
    [3]
    周敏.浅谈向家坝水电站三期横向围堰施工的质量控制[J].四川水力发电,2019,38(2):81-82

    +96.
    [4]
    付默菡.锦凌水库一期围堰填筑施工工艺与方法探究[J].水利规划与设计,2016(8):133-135
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (87) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return