Citation: | SUN Dong. Analysis of the Lithography Copy Machine Based on ABAQUS[J]. Intelligent Building and Construction Machinery, 2020, 2(2): 63-67. |
[1] |
曾攀.有限元分析及其应用[M].北京:清华大学出版社,2004.
|
[2] |
赵腾伦.ABAQUS 6.6在机械工程中的应用[M].北京:中国水利水电出版社,2007.
|
[3] |
石亦平,周玉容.ABAQUS有限元分析实例详解[M].北京:机械工业出版社,2008.
|
[4] |
徐洪玉,侯中华,肖琪珃.数控铣床振动模态分析[J].机床与液压,2009,37(7):47-49.
|
[5] |
袁安富,郑棋.基于ANSYS的机床模态分析[J].计算机工程应用技术,2008(1):56-58.
|
[6] |
张宪栋,徐燕申.基于FEM的数控机床结构部件静动态设计[J].机械设计,2005,22(5):89-90.
|
[2] | WEN Yaotian. BIM Technology Analysis of Comprehensive Installation of Building Pipeline[J]. Intelligent Building and Construction Machinery, 2022, 4(1): 40-42. |
[4] | JI Zhongke. Design and Research on Software Controlled Rail Transit Boundary Detection Device[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 48-53. |
[5] | LI Fenglong. Analysis on Safety Management Measures of Power Tunnel[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 72-74. |
[6] | XUE Qingwei. Analysis on the Application Prospect of Foamed Asphalt Technology[J]. Intelligent Building and Construction Machinery, 2021, 3(10): 21-23. |
[7] | ZHANG Yazhi. Design Analysis of Desulfurization Tower Body[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 125-128. |
[8] | MA Junjiang. Analysis of Remanufacturing Design of Hitachi Shield Machine Fluid System[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 54-59. |
[9] | ZHANG Dechuan. Application Analysis of Mechanical Foaming Warm Asphalt Technology in Changshen-Beijing-Shanghai High-speed Connecting Line Project[J]. Intelligent Building and Construction Machinery, 2021, 3(9): 54-56. |
[10] | ZENG Mingjie. Installation Analysis of Chain-bucket Continuous Ship Unloader[J]. Intelligent Building and Construction Machinery, 2021, 3(1): 48-49. |
[11] | ZHAO Yongxiang. Troubleshooting and Analysis of Metro Shield Machine[J]. Intelligent Building and Construction Machinery, 2021, 3(2): 82-84. |
[12] | XIAO Qiaolian. Problems and Countermeasures of Water Conservancy Project Management in Grass Roots[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 80-81. |
[13] | LIAN Zhensi. Basic Theory Analysis of Planning and Construction of Smart Ecological City[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 108-110. |
[14] | CHEN Yaohui. Talking about Staad.Pro the Application of Software in the Calculation of Pool Structure[J]. Intelligent Building and Construction Machinery, 2020, 2(3): 9-12. |
[15] | LI Xiaolong. Analysis on Energy Saving Design of Indoor Ice Rink[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 118-120. |
[16] | CHEN Xiangyong. Vibration Analysis of the Reactor Foundation[J]. Intelligent Building and Construction Machinery, 2020, 2(5): 53-54. |
[17] | LI Haiping. Analysis on the Key Points of Surveying and Mapping in Electric Power Engineering[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 88-89. |
[18] | PEI Jie. Analysis of Common Failure Causes of Tower Cranes and Preventive Measures[J]. Intelligent Building and Construction Machinery, 2020, 2(11): 71-72. |
[19] | ZHOU Bing. Application Analysis of Large Diameter Long Spiral Grouting Pile in Foundation Pit Support[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 1-4. |
[20] | SUN Dong. Numerical Simulation of Air Distribution in Long Grating Lithography Workshop[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 52-54. |