Volume 2 Issue 8
Aug.  2020
Turn off MathJax
Article Contents
LI Jiangning. Problems and Countermeasures in Follow-up Audit of Hospital Infrastructure Projects[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 115-116.
Citation: LI Jiangning. Problems and Countermeasures in Follow-up Audit of Hospital Infrastructure Projects[J]. Intelligent Building and Construction Machinery, 2020, 2(8): 115-116.

Problems and Countermeasures in Follow-up Audit of Hospital Infrastructure Projects

  • Received Date: 2020-07-02
  • Rev Recd Date: 2020-08-17
  • Available Online: 2022-03-28
  • Publish Date: 2020-08-28
  • Tracking audit is a new audit method used in the audit of infrastructure projects. This method can implement dynamic control and supervision on infrastructure projects, thus improving the utilization rate of capital construction funds and avoiding the appearance of image projects, performance projects or bean curd dregs projects. Especially for the hospital infrastructure project, due to the large investment, long construction period and many uncontrollable factors, it is necessary to strictly control and supervise the whole process of hospital infrastructure construction by tracking audit method, so as to create a comfortable treatment and working environment for patients and medical staff .

     

  • loading
  • [1]
    吴兰.基建工程跟踪审计的重要性[J].中国乡镇企业会计,2020(7):169-170.
    [2]
    覃胜超,黎宇.新医改背景下医院基建工程项目审计应用探讨[J].四川水泥,2019(8):300+344.
    [3]
    黄文斌.浅谈医院基建工程全过程跟踪审计[J].财讯,2017(11):159.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (56) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return