Volume 2 Issue 1
Jan.  2020
Turn off MathJax
Article Contents
LIU Dexin. Construction Control Technology of Gas Lift Reverse Circulation Bored Pile in Complex Geological Environment with High Tide Difference[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 44-46.
Citation: LIU Dexin. Construction Control Technology of Gas Lift Reverse Circulation Bored Pile in Complex Geological Environment with High Tide Difference[J]. Intelligent Building and Construction Machinery, 2020, 2(1): 44-46.

Construction Control Technology of Gas Lift Reverse Circulation Bored Pile in Complex Geological Environment with High Tide Difference

  • Received Date: 2019-11-10
  • Rev Recd Date: 2020-01-21
  • Available Online: 2022-03-28
  • Publish Date: 2020-01-28
  • With the rapid development of bridge construction, long-span bridges continue to emerge, so higher requirements are put forward for the quality of pile foundation. Combined with engineering examples, this paper introduces a construction method of using air lift reverse circulation drilling machine to control the quality of pile.Engineering practice shows that this method can be used in pile foundation construction in complex geological environment.

     

  • loading
  • [1]
    中交第一公路工程局有限公司.JTG/T F50-2011,公路桥涵施工技术规范[S].北京:人民交通出版社,2011.
    [2]
    秦顺全,高宗余,潘东发.武汉天兴洲公铁两用长江大桥关键技术研究[J].桥梁建设,2008(S2):99-105.
    [3]
    中交第二公路工程局有限公司.公路桥梁施工系列手册墩台与基础(下篇)[M].北京:人民交通出版社,2014.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (49) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return