MOU Nan. Discussion on the Construction Technology of Manual Digging Pile under Special Geological Conditions[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 29-30.
Citation: MOU Nan. Discussion on the Construction Technology of Manual Digging Pile under Special Geological Conditions[J]. Intelligent Building and Construction Machinery, 2020, 2(9): 29-30.

Discussion on the Construction Technology of Manual Digging Pile under Special Geological Conditions

  • Received Date: 2020-08-02
  • Rev Recd Date: 2020-09-21
  • Available Online: 2022-03-28
  • Publish Date: 2020-09-28
  • This article briefly introduces the construction problems caused by the special ground conditions in the manual digging pile construction of the Baili Rhododendron public rental housing project in Guizhou Province, the construction techniques and methods adopted in response to the construction problems, and the targeted construction treatment The experience and experience gained, and the karst cave treatment and groundwater treatment technology are explained, in order to provide reference for the construction of similar projects.

     

  • loading
  • [1]
    曹贤发,张家生,刘之葵,等.施工期间人工挖孔桩桩间土稳定性分析[J].岩土力学,2013(5):1 443-1

    448.
    [2]
    金国龙,王勇,顾开云.人工挖孔桩施工对紧邻基坑围护结构的影响[J].上海交通大学学报,2012(1):84-88.
    [3]
    刘继国,曾亚武.FLAC3D在深基坑开挖与支护数值模拟中的应用[J].岩土力学,2006(3):505-508.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (91) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return