Design and Application of RCC Transportation Method with Over 100 m Full Pipe

  • Received Date: 2021-05-10
  • Rev Recd Date: 2021-06-16
  • Available Online: 2022-01-28
  • Publish Date: 2021-06-28
  • With its height of 167.50 m, the water-retaining dam of Wanjiakouzi Hydropower Station is currently the world's highest RCC double-curvature arch dam. Because high hills, steep slopes and precipitous valleys are covered around the dam site area, it is very difficult to lay out the construction road connecting to the working face.By comparison of vertical concrete transportation methods, over 100 m full pipe transportation system have been developed and adopted as a means of transporting RCC into the working face, which has achieved good technical,economic and social benefits. Practice has proven that the method is worthy of reference for similar projects.

     

  • loading
  • [1]
    高宇,盘春军,卢山.万家口子水电站碾压混凝土双曲拱坝工程综述[J].红水河,2020,39(1):1-6.
    [2]
    杜汉清.碾压混凝土垂直输送施工技术研究与应用[J].建筑工程技术与设计,2014(10):110.
    [3]
    DL/T 5144-2015.水工混凝土施工规范[S].
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (51) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return