Volume 2 Issue 4
Apr.  2020
Turn off MathJax
Article Contents
LI Xin. Talking about the Construction Technology of Concrete Anti-seepage Wall in Gangu Urban and Rural Water Supply Dazhuang Project[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 38-40.
Citation: LI Xin. Talking about the Construction Technology of Concrete Anti-seepage Wall in Gangu Urban and Rural Water Supply Dazhuang Project[J]. Intelligent Building and Construction Machinery, 2020, 2(4): 38-40.

Talking about the Construction Technology of Concrete Anti-seepage Wall in Gangu Urban and Rural Water Supply Dazhuang Project

  • Received Date: 2020-03-03
  • Rev Recd Date: 2020-04-02
  • Available Online: 2022-03-28
  • Publish Date: 2020-04-28
  • The study found that the construction environment of the dam impervious wall, the reliability of the concrete and slurry mixing system, the concrete construction process and construction technology all have an important influence on the construction quality of the dam's concrete impervious wall. In order to improve the quality of the cut-off wall, this article takes the construction of the cut-off wall of the Gangu Dazhuang Project as an example, briefly describes the construction technology of the cut-off wall of the dam, in order to provide a reference for similar projects.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (49) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return