ZHANG Xin. Elementary Discussion on Subgrade Treatment Technology of Upper Road in Shallow Buried Section of Parallel High-speed Rail and Metro[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 31-33.
Citation: ZHANG Xin. Elementary Discussion on Subgrade Treatment Technology of Upper Road in Shallow Buried Section of Parallel High-speed Rail and Metro[J]. Intelligent Building and Construction Machinery, 2021, 3(3): 31-33.

Elementary Discussion on Subgrade Treatment Technology of Upper Road in Shallow Buried Section of Parallel High-speed Rail and Metro

  • Received Date: 2021-02-02
  • Publish Date: 2021-03-28
  • According to the basic principle of subgrade construction and the practical construction experience of the subgrade engineering of the South Rapid ground Auxiliary Road of Qingdao New Airport, the construction technology of the upper subgrade under the condition of high-speed rail and subway parallel shallow burying is put forward. Through engineering practice, it is shown that through reasonable selection of subgrade fi ller, compaction equipment and method, it can effectively avoid the problems of disturbance to existing railway line caused by the construction of upper subgrade under the condition of guaranteeing the quality of subgrade fi lling. This construction technology can provide a reference for the subsequent construction of similar projects.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (99) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return