Volume 3 Issue 7
Jul.  2021
Turn off MathJax
Article Contents
LING Zhi. Research on the Control and Management of Highway Engineering Cost Based on PPP Mode[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 61-63.
Citation: LING Zhi. Research on the Control and Management of Highway Engineering Cost Based on PPP Mode[J]. Intelligent Building and Construction Machinery, 2021, 3(7): 61-63.

Research on the Control and Management of Highway Engineering Cost Based on PPP Mode

  • Received Date: 2021-06-10
  • Rev Recd Date: 2021-07-19
  • Available Online: 2022-01-28
  • Publish Date: 2021-07-28
  • This paper takes a 37.6 km two-way four-lane fi rst-class highway bidding by a city, studying the control and management strategy of the preliminary cost of road engineering in PPP model. By analyzing the profi t model under PPP model, a quantitative analysis model through model analysis method was studied, and a deep quantitative analysis of the PPP primary highway project bidding by the city through case analysis method was conducted, and fi nally found many practical problems. This paper fi nally believes that: under the PPP mode, the bidding department should do enough work in the bidding process and cost reserve, and require the relevant departments to cooperate closely, in order to obtain a more detailed and eff ective preliminary project cost results.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (67) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return