Analysis on the Tunnel Entry Technology of Super-large Cross-section
-
摘要: 随着我国交通需求的不断提升,交通建设工程涉及的领域也不断拓展,因此隧道工程面临着较大挑战,本文以提升超大断面隧道进洞技术为目的,结合实际工程案例。首先分析超大断面隧道的理论及发展特点;其次,分析相应的工程实例;最后,针对工程实际情况,分析在超大断面条件下如何落实安全隧道进洞施工技术。通过本文论述,以期能够全面提升当前交通工程的施工质量,进一步优化隧道施工的安全性和稳定性。Abstract: With the continuous improvement of transportation demand in China, the fields involved in transportation construction engineering are also expanding. Therefore, tunnel engineering is facing great challenges. This article aims to improve the tunnel entry technology of super-large cross-section tunnels, combined with actual engineering cases. First, analyze the theory and development characteristics of the super-large cross-section tunnel; secondly,analyze the corresponding engineering examples; and finally, according to the actual situation of the project, analyze how to implement the construction technology of safe tunnel entry under the super-large cross-section condition.Through the discussion in this article, we hope that we can comprehensively improve the construction quality of current traffic engineering and further optimize the safety and stability of tunnel construction.
-
Key words:
- super large section /
- tunnel engineering /
- tunneling technology
-
[1] 刘红轲.超大断面隧道进洞技术的探讨[J].山西建筑,2018,44(5):175-177. [2] 李凯,陈军社.暗挖大断面隧道临时支撑拆除及衬砌施工方法[J].筑路机械与施工机械化,2019,36(11):62-68+74. [3] 魏燃.Ⅴ级围岩大断面隧道开挖步序及对边坡稳定性影响研究[J].公路工程,2019,44(3):222-227.
点击查看大图
计量
- 文章访问数: 34
- HTML全文浏览量: 4
- PDF下载量: 0
- 被引次数: 0